Balanced DietLab

Category · Probiotics

Probiotics OEM — from strain selection to guaranteed CFU

Strain blends, guaranteed CFU design, coating and freeze-drying stability, and stick or capsule formats — reviewed together. Labelled counts are set for end of shelf life, not production day.

  • Reply within 1–3 business days
  • MOQ from 1,000 units
  • Free consultation & quote
  • Recipe IP protection clause

At a glance — process, licensing, MOQ

Balanced DietLab standard values as of 2026-07; adjusted by dosage form, volume and export scope.

6-step OEM process
StepDurationDeliverable
1 · Concept1 weekConcept brief
2 · Formulation2–3 weeks3 formulas · COGS · claim draft
3 · Sampling2–3 weeksSamples · stability report · label
4 · Licensing & ad screening2–4 weeks (parallel)Manufacturing report · ad approval no.
5 · Mass production2–4 weeksFinished goods · lot CoA
6 · Shipping1–2 weeksDelivery · sales dashboard
Licensing & screening checklist
ItemAuthority · basisTime
Product manufacturing reportLocal authority (plant)1–2 weeks
Ad pre-screeningKorea Health Functional Food Assoc.2–4 weeks
Functional ingredient evidenceMFDS notified / individually approvedVerified at formulation
HACCP · GMPHeld by consortium plantsAlways valid
Export documents (FOB)Free-sale cert · ingredient analysis1–3 weeks
MOQ & lead time by dosage form
Dosage formMOQ (units)Standard lead time
Powder · stick1,0006 weeks
Jelly · gummy · granule2,0008 weeks
Tablet · liquid stick · pouch3,0008–10 weeks
Capsule · softgel · RTD5,00010–14 weeks

Source documents: /docs/oem-odm-process-guide.md · /docs/hff-approval-checklist.md

Common pain points

  • Labelled CFU vs actual CFU

    Designing only for production day means counts fall during distribution.

  • Strain cost varies by quote

    Same CFU, very different cost depending on supplier and coating.

  • Unclear claim scope

    Claims written without checking notified vs individually approved get blocked.

How BDL responds

  • CFU guaranteed at expiry

    Overage, coating, and water activity are all factored to hit expiry-date counts.

  • 🧪 AI compares strain blends

    Draft strain blends by target claim and cost band in 3–5 minutes.

  • Claim route checked upfront

    Label wording is reviewed against screening rules during formulation.

MOQ · Lead-time summary

Stick powder 1,000 · capsule 5,000 · tablet 3,000 · sample min 6 wks · full 8–14 wks.

FAQ for this audience

How is guaranteed CFU labelled?

Labelled for end of shelf life and verified per lot.

Ask about this
Synbiotics and postbiotics too?

Yes — prebiotic blends and heat-killed postbiotics are both supported.

Ask about this
Is cold chain required?

Coated freeze-dried strains ship at ambient; stability testing confirms it.

Ask about this

Related guides & FAQs

Get your first quote in a 30-minute free consultation

Share target, MOQ, dosage form, and channel — we return a preliminary quote and lead time within 24 hours.

Weekdays 10:00–18:00 KST · All inquiries are handled confidentially.